main image

Track Record

Some sample projects by our staff

Metro Universal Accessibility Project Construction Management

Construction management and inspection for approximately 500 bus stop reconstruction locations for compliance with ADA regulations

Local Drainage Projects, City of Houston

Professional engineering services to address local storm water drainage system improvements and repairs citywide

Southeast Water Purification Plant

200 MGD Water purification plant – Plant Rehabilitation

Storm Water Pumping Stations And Flood Warning Systems

Rehabilitation of stormwater pumping stations and flood warning systems through out the city of Houston.

Hurricane Harvey Disaster Cost Recovery for Wastewater Lift Station

Reviews and analysis of all existing documentation on 23 lift stations.

Dillard University Hazard Mitigation Grant Program, Dillard University, New Orleans, Louisiana.

Construction Management for drainage improvements on the campus of Dillard University.

Camp As Saliyah Base Operation and Services, U.S. Army Base Camp As Saliyah, Doha, Qatar.

On-site Civil Engineering Consultant, As part of the As Saliyah Base Operation and Services Contract

Sims Bayou Flood Study, Harris County Flood Control District, Houston, Texas.

30-mile drainage ditch, HEC-2 and HEC-RAS to modeling

Sheppard Avenue Light Rail Transit (LRT), Toronto Transit Commission, Toronto, Ontario.

Amalgamation of the detailed design for construction for three (3) phases of project for a new LRT

Kirby Drive Roadway – Preliminary Engineering

Preliminary engineering investigation services for a potential extension of Kirby Drive approximately one mile

Duessen Park Waterfront, Harris County, Texas

Drainage, hydrology, and hydraulic engineering services

Groundwater Reduction Plan (GRP) Conversion Waterlines NE Area Group B

Preliminary Engineering services for approximately 3.5 miles of 24-inch waterline in the City of Houston

Joint Booster Pump Station No. 1 (JB2), Tarrant Regional Water District

Final design services through 60% design for Joint Booster Pump Station No. 1 (JB2) - 240 acre site.

Houston Area Lift Station Study, City of Houston

Study, design, and construction of nine (9) sewer pumping stations in the Houston Area

We are Certified as

Minority Business Enterprise

Small Business Enterprise

Historically Underutilized Business